The Signal / Fannie Mae policy / October 8, 2026
Highest and best use under UAD 3.6
Highest and best use after the present-use rule One Dallas house, two answers
On UAD 3.6 reports, Fannie Mae now accepts a residential highest and best use that differs from the present use. We ran one composite Dallas house through the four tests in two submarkets, showed how each result reports on the redesigned URAR, and mapped which parts of the analysis AI tools can retrieve today.
Market B, the composite house
- Value as improved
- $650,000
- Land value by residual
- $668,156
- Contribution of the house
- −$18,156
SEL-2026-08
The present use no longer has to be the highest and best use
Fannie Mae issued Selling Guide Announcement SEL-2026-08 on September 2, 2026 and reissued it on September 23. The reissue moved a rental income date from November 1 to December 1 and left the highest and best use change as issued. SEL-2026-08 ↗ For reports completed on UAD 3.6, the highest and best use of the property as improved, or as proposed, must be a residential use, and it no longer has to be the present use. Reports on the legacy forms stay under the old rule.
The policy sits in the UAD 3.6 Policy Supplement. It also replaces the “residential in nature” standard: the property must be a primarily residential one- to four-unit property, and any non-residential use must be subordinate. Policy Supplement ↗
The present use must be the highest and best use
Fannie Mae buys only loans where the property “represents the highest and best use of the site as improved.”
A “No” answer: the loan was ineligible, and in practice it stopped. AppraisersBlogs ↗
The highest and best use must be residential
The present use is no longer required to be the highest and best use, if the highest and best use as improved or as proposed is residential.
A “No” answer: “does not, by itself, make the property ineligible” (FAQ Q23). HBU FAQ ↗
Under the legacy guide, an existing use counted as the highest and best use when comparable sales showed the improvements were typical and the value as improved exceeded the value of the vacant site. B4-1.3-04 ↗ A house worth less than its lot failed that test, and the loan could not be sold to Fannie Mae. On a UAD 3.6 report the same answer moves the analysis into the commentary field, where the appraiser states the residential highest and best use and the support for it.
Timing
Through May 2027, the investor and the form version decide which rule applies
UAD 3.6 is mandatory for UCDP submissions on or after November 2, 2026. Freddie Mac FAQ ↗ Lender Letter LL-2026-08, issued September 30, lets approved lenders keep submitting UAD 2.6 until May 19, 2027, and the exception is requested separately from each GSE. LL-2026-08 ↗ A UAD 2.6 report is a legacy-form report, so it carries the old present-use rule.
- SEL-2026-08 issued
Highest and best use change effective at once for reports completed on UAD 3.6.
- SEL-2026-08 reissued
Moves a rental income date from November 1 to December 1, 2026.
- LL-2026-08
Approved lenders may keep submitting UAD 2.6. Each GSE grants the exception separately.
- UAD 3.6 mandate
Required for UCDP submissions from this date, except under an approved exception.
- UAD 2.6 downgraded
UAD 2.6 reports get a CU score of 999 and lose rep and warranty relief.
- Last UAD 2.6 date
Final day an approved lender may submit UAD 2.6 under the exception.
- UAD 3.6 for all
Required for every new submission.
- UAD 2.6 support ends
Fannie Mae, UAD 3.6
- Must the present use be the highest and best use?
- No
- Highest and best use standard
- Residential, as improved or as proposed
Fannie Mae, UAD 2.6 by exception
- Must the present use be the highest and best use?
- Yes
- Highest and best use standard
- The site as improved
Freddie Mac
- Must the present use be the highest and best use?
- Yes, as reported
- Highest and best use standard
- As improved or as proposed
Freddie Mac’s September 2, 2026 guide update made no matching change, according to National Mortgage News, and its guide still requires the present use to be the highest and best use. National Mortgage News ↗ The two GSEs also differ on ADUs: Freddie Mac allows one ADU on a one- to three-unit property and accepts an illegal ADU only on a one-unit property with two comparables that have non-compliant ADUs. Freddie Mac ADU checklist ↗
Our reading of the two rules together: a file whose present use fails one of the tests can be salable to Fannie Mae on UAD 3.6 and unsalable to Freddie Mac, and through May 19, 2027 an approved lender’s UAD 2.6 report on the same house still carries the old rule. The appraiser’s analysis is the same in each case.
The redesigned URAR
The form asks for each test separately, then for the answer
The four tests run in a fixed order: legally permissible, physically possible, financially feasible and maximally productive. McKissock ↗ The UAD 3.6 URAR applies them to the present use, one Yes or No field each. Two questions follow: whether the highest and best use as improved, or as proposed per plans and specifications, is the present use, and whether the highest and best use is residential. A Highest and Best Use Commentary field holds the explanation. HBU Playbook ↗
Fannie Mae’s FAQ, dated September 8, sets the order of work. The appraiser determines the present use first, from the property’s physical design and function, and occupant behavior alone does not set it (Q1 to Q4). Any No on the four tests forces a No on the present-use question (Q13). When the highest and best use is residential and differs from the present use, the commentary states it with supporting rationale (Q16). HBU FAQ ↗
The Playbook works through ten scenarios with an answer for each test. Scenario 8, a livable one-unit house on a lot upzoned to six units, is the closest published case to a Dallas teardown: Fannie Mae marks financially feasible and maximally productive No when redevelopment beats the present use, and the loan stays eligible with one-unit comparables zoned for up to six units and similarly positioned for redevelopment. Scenario 10 says subdivision potential “does not, by itself, change the highest and best use.” HBU Playbook ↗
- 01
Illegal ADU
LPFMEligibleThree or more comps, two or more with ADUs of the same non-compliant zoning use
- 02
Two units combined into one
LPFMEligibleSimilar comps
- 03
Commercial zoning, weak commercial demand
LPFMEligibleSimilar comps
- 04
Commercial zoning, vacant commercial value exceeds residential
LPFMNot eligibleURAR not appropriate; do not deliver
- 05
Subordinate agricultural use
LPFMEligibleComps with a similar subordinate use
- 06
Hangar garage, residential primary
LPFMEligibleComps with a similar hangar
- 07
Industrial hangar as the primary use
LPFMNot eligibleURAR not appropriate
- 08
Upzoned to six units, livable one-unit house
LPFMEligibleOne-unit comps zoned for up to six units, similarly positioned for redevelopment
- 09
Second buildable parcel
LPFMEligibleComps with multiple parcels
- 10
Subdividable single parcel
LPFMEligibleSingle-parcel comps with excess land
Three FAQ answers bear directly on older houses. An obsolete improvement can still be the highest and best use if it adds positive market value (Q7). Fannie Mae values the existing or proposed improvements and “does not require the property owner to modify or redevelop,” while an as-if-vacant analysis can still matter for site value, obsolescence and comparable selection (Q9). Comparables must share the subject’s highest and best use and similar legal characteristics (Q11). The FAQ does not address teardowns, land value above improved value, or the probability of a rezoning. HBU FAQ ↗
Case study
A 1946 house on a 50 by 150 foot R-7.5(A) lot
The subject is a composite with a fictional address: a 1,450 square foot one-story brick house built in 1946, in C4 condition, on a 7,500 square foot lot with a detached one-car garage, zoned R-7.5(A). We assume it sits outside any planned development, conservation district, neighborhood stabilization overlay, historic overlay, demolition delay overlay or ADU overlay, with no recorded deed restrictions beyond the plat. Each assumption is a lookup in the City’s Map Hub and the county records. Dallas zoning resources ↗
We place the same structure in two submarkets. In Market A, the East Dallas core, the value as improved is $425,000, $293 per square foot. In Market B, the Lakewood edge, it is $650,000, $448 per square foot. Lakewood’s conservation district expansion passed in February 2025, so in Market B the overlay check is required before anything else. CandysDirt ↗ Every value, price, cost and probability in this case is a modeling assumption to be replaced with closed sales and contractor bids.
- Lot
- Setbacks
- Coverage
- New house
50 by 150 feet is 7,500 square feet, the R-7.5(A) minimum. The district sets no minimum lot width or depth, no density cap, no floor area ratio and no story limit. R-7.5(A) ↗
A 25 foot front yard and 5 foot side and rear yards for single family leave 40 by 120 feet, or 4,800 square feet of buildable footprint.
Residential lot coverage is capped at 45%: 3,375 square feet. Coverage binds before the setbacks do. Height is limited to 30 feet.
A 3,400 square foot two-story house with an attached two-car garage fits on a footprint near 2,150 square feet. Since the City’s May 2025 parking reform, R districts need one space per unit. Parking amendment ↗
The legal stack
Two uses are by right; every other candidate needs a board, a petition or a rezoning
The legally permissible test reads five layers of rules, and each one comes from a different source. For the composite lot we assume each lookup comes back clear; in an assignment each one is run and recorded.
- 05
Private deed restrictions and HOA rules
Not enforced by the City and not overridden by SB 15 or SB 840. The City’s own list is incomplete, so this is a county records search. Source ↗
This lot: Assumed none beyond the plat
- 04
Overlays: PD, conservation district, NSO, historic, demolition delay, ADU
Dallas has more than 1,000 planned development districts, each its own ordinance. The online copies are convenience copies and some are not posted. Source ↗
This lot: Assumed none; Market B sits where the Lakewood conservation district expansion makes this check mandatory
- 03
Base district: R-7.5(A), Chapter 51A
7,500 sf minimum lot, 25 ft front, 5 ft side and rear for single family, 30 ft height, 45% residential coverage. Source ↗
This lot: Single-family use by right
- 02
State law: SB 15, SB 840, HB 24, SB 785
Small-lot and by-right multifamily laws that took effect September 1, 2025, a protest-petition change, and a manufactured-home law effective September 1, 2026. Source ↗
This lot: SB 15 and SB 840 do not apply; HB 24 bears on rezoning odds
- 01
Plan guidance: ForwardDallas 2.0
A land use guide adopted September 25, 2024. It rezones nothing; staff and the City Plan Commission review rezonings for consistency with it. Source ↗
This lot: Community Residential: multiplex is a secondary use
| Candidate | Zoning path | Units | Status |
|---|---|---|---|
| Present use, the 1,450 sf house | By right | 1 | Permissible |
| New single-family house | By right | 1 | Permissible |
| House plus a non-rentable ADU | Board of Adjustment special exception | 1 plus a guest unit | Needs approvalThe board denied one 5 to 0 on May 19, 2026 |
| House plus a rentable ADU | ADU overlay, by neighborhood petition | 2 | Not permissibleRequires an overlay the neighborhood has not sought |
| Lot split | 7,500 sf minimum lot | 2 | Not permissibleSB 15 does not reach a platted lot under 5 acres |
| Duplex | Rezone to D(A) | 2 | Needs approvalTested at a 35% approval probability |
| Townhomes | Rezone to TH-3(A): 12 units per acre × 0.172 acre = 2.07 | 2 | Needs approvalSame yield as the duplex; TH-1(A) and TH-2(A) yield 1 |
| Fourplex | Rezone to MF-1(A): 7,500 sf ÷ 1,800 sf per two-bedroom unit = 4.17 | 4 | Needs approvalAgainst the Community Residential primary use; tested at 10% |
| Multifamily by right under SB 840 | Commercial and office districts only | n/a | Not applicableResidential zoning is outside SB 840 |
ADUs. A typical Dallas single-family lot has no by-right ADU. One route is a Board of Adjustment special exception for an additional dwelling unit, which cannot be rented and requires a deed restriction; the board still denies them, including a 5 to 0 denial in an R-10(A) case on May 19, 2026. BOA minutes ↗ The other is an ADU overlay that the neighborhood petitions for, with a 200 square foot minimum, a maximum of the greater of 700 square feet or 25% of the main structure, and the owner living in one unit while either is rented. §51A-4.510 ↗ UAD 3.6 allows up to three ADUs on a one-unit principal residence from March 31, 2026, so Fannie Mae’s side is broader than Dallas zoning. Clear Capital ↗ A statewide by-right ADU bill, SB 673, passed the Texas Senate 31 to 0 and died on the House calendar in May 2025. SB 673 ↗
State law. SB 15 caps lot sizes at 3,000 square feet, but only on unplatted single-family tracts of 5 acres or more in large cities. SB 15 ↗ SB 840 allows multifamily and mixed use by right in districts that permit office, commercial, retail or warehouse uses. Dallas SB 840 sheet ↗ Neither reaches a platted R-7.5(A) lot. SB 785 requires cities to allow new HUD-code manufactured homes by right in at least one residential district from September 1, 2026. SB 785 ↗
Rezoning. A use that needs a zoning change passes the legal test only with a reasonable probability of approval as of the effective date; no Fannie Mae document addresses that probability. ForwardDallas 2.0 makes a multiplex of fewer than nine units a secondary use in Community Residential areas, so a duplex rezoning is consistent with the plan and still needs the City Plan Commission and the Council. CandysDirt ↗ Under HB 24, a protest against a change allowing more housing counts only with owners of 60% of the land within 200 feet, and the Council can override it with a simple majority. HB 24 ↗ The model assumes a 35% chance of approval for D(A) and 10% for MF-1(A). Council’s April 2025 change lets buildings of three to eight units, up to three stories and 7,500 square feet, use the residential code with a single stair, which lowers fourplex hard cost if the zoning ever allows one. NLC ↗
Physically possible: the lookups, assumed clear here
- Flood zone and any letter of map revisionFEMA National Flood Hazard Layer, which holds final maps only
- Slope and drainageUSGS 3DEP lidar, statewide in Texas since 2020 with one gap southeast of Dallas
- Tree permitArticle X exempts most single-family lots under 2 acres, but not a lot where a structure is being demolished
- Expansive clay soilsCarried as a $35,000 site and foundation premium in the model
- Water and wastewater capacityA Dallas Water Utilities letter, $150; a wastewater capacity analysis, $800
- Easements on the platCounty records; we found no automated source
Sources: USGS 3DEP ↗ Dallas tree rules ↗ Dallas Water Utilities ↗
Residual land value
The same house adds $170,624 in one market and nothing in the other
A residual land analysis starts from what a new house would sell for and subtracts everything it takes to build and sell it, including the developer’s profit. What is left is what a builder could pay for the lot. The contribution of the existing house is its value as improved less that land value; at or below zero, the house adds nothing over the lot and the present use fails the maximally productive test. Under the Playbook’s convention it fails financially feasible too.
Both markets use the same cost structure: a $35,000 site and foundation premium for expansive clay, $22,000 for demolition and abatement, $10,000 for the tree permit and mitigation, soft costs at 10% of hard cost, financing at 6%, selling costs at 5% and a 15% developer profit on sales.
- Gross sales, 3,400 sf at $425/sf$1,445,000
- Hard cost, $210/sf−$714,000
- Soft cost, 10% of hard−$71,400
- Site work and foundation−$35,000
- Demolition and abatement−$22,000
- Tree permit and mitigation−$10,000
- Financing, 6%−$49,224
- Selling cost, 5% of sales−$72,250
- Developer profit, 15% of sales−$216,750
- Land value by residual$254,376
- Value as improved, the house as it stands$425,000
Contribution of the existing house+$170,624$425,000 as improved less $254,376 land value
- Gross sales, 3,400 sf at $650/sf$2,210,000
- Hard cost, $260/sf−$884,000
- Soft cost, 10% of hard−$88,400
- Site work and foundation−$35,000
- Demolition and abatement−$22,000
- Tree permit and mitigation−$10,000
- Financing, 6%−$60,444
- Selling cost, 5% of sales−$110,500
- Developer profit, 15% of sales−$331,500
- Land value by residual$668,156
- Value as improved, the house as it stands$650,000
Contribution of the existing house−$18,156$650,000 as improved less $668,156 land value
Market A. The land value as vacant is about $254,376, $33.92 per land square foot. Asking prices for single-family lots in Old East Dallas run $24 to $36 per land square foot, or $180,000 to $270,000 for 7,500 square feet; those are asks, and closed sales would still be needed. Homes.com ↗ The house contributes $170,624 over its lot, the present use passes all four tests, and the report answers Yes throughout. The loan is eligible at both GSEs.
Market B. The same new house sells for $650 per square foot, and the residual land value is $668,156, above the $650,000 value as improved. The house contributes −$18,156. The highest and best use as vacant is a new single-family house, and the highest and best use as improved is demolition and redevelopment with a new single-family house. In a teardown market the comparable sales for the house as it stands are themselves land purchases, so the improved value and the land value converge.
“You’re looking for evidence that people are starting to buy, tear down homes, and rebuild something else.”
Testing higher density
In Market B a duplex ties the new house before the rezoning delay and loses after it
A use that needs a rezoning carries its cost, its delay and the chance it fails. The model charges $45,000 and 9 months for D(A) and $60,000 and 12 months for MF-1(A), raises the developer profit to 18% of sales, discounts the delay at 10% a year, and assumes a failed rezoning falls back to the new house after the same delay with the rezoning cost spent.
- New single-family houseBy right$254,376
- DuplexD(A), 35% approval, 9 months$184,286$182,900 at approval
- FourplexMF-1(A), 10% approval, 12 months$158,665$49,936 at approval
Value as improved, $425,000
- New single-family houseBy right$668,156
- DuplexD(A), 35% approval, 9 months$593,836$671,300 at approval
- FourplexMF-1(A), 10% approval, 12 months$533,405$448,048 at approval
Value as improved, $650,000
At full approval the Market B duplex is worth $671,300 as land against $668,156 for the new house. Nine months of delay bring it to $624,989, and the approval odds to $593,836. Even with approval certain, the duplex falls behind the by-right house once the rezoning takes more than about 18 days. The single-family price premium per square foot absorbs the extra unit, so upzoning does not change the highest and best use here. The fourplex loses in both markets in every case, even with the single-stair code path and no parking requirement for multifamily of up to 20 units.
Market B duplex: change the odds and the delay
The by-right new house is $668,156. Move the sliders to see where the duplex lands.
Duplex, risk-adjusted$593,836
Against the new house−$74,320
The new house remains the highest and best use.
Market B
New-house pricing 1.0% lower erases the teardown margin
The Market B conclusion rests on a margin of $18,156. The residual moves 0.80 dollars for every dollar of new-house sales and 1.166 dollars for every dollar of hard cost, so the margin is gone at about $643 per square foot instead of $650, or with hard cost about 1.8% higher.
| Hard cost −10% | Hard cost as modeled | Hard cost +10% | |
|---|---|---|---|
| Sale price −10% | $594,430−$55,570 | $491,356−$158,644 | $388,282−$261,718 |
| Sale price as modeled | $771,230+$121,230 | $668,156+$18,156 | $565,082−$84,918 |
| Sale price +10% | $948,030+$298,030 | $844,956+$194,956 | $741,882+$91,882 |
Move both inputs
Change from the modeled $650 per square foot sale price and $260 per square foot hard cost.
Residual land value$668,156
Contribution of the house−$18,156
Redevelopment exceeds the present use.
The Market B call depends on the support for new-construction pricing more than on any legal question. A report could state the probability that redevelopment beats the present use, with the distribution of inputs behind it, in place of a single residual.
The Market B report
How the Market B answer reports on the URAR
Highest and Best Use
- Present use legally permissibleYesR-7.5(A), single-family by right
- Present use physically possibleYesThe improvements exist on the site
- Present use financially feasibleNoContribution at or below zero, following the Playbook’s Scenario 8 convention
- Present use maximally productiveNoThe new-house residual exceeds the value as improved
- Highest and best use as improved is the present useNoRequired by FAQ Q13 once any test is No
- Highest and best use is residentialYesA new single-family house
- Fannie Mae, UAD 3.6Eligible under SB2-3-01 if every other requirement is met
- Fannie Mae, UAD 2.6 under LL-2026-08The old present-use rule applies
- Freddie MacPresent-use requirement not met, as reported
The present use is legally permissible and physically possible. It fails financially feasible and maximally productive, so the present-use question is No, and the highest and best use is residential. Under FAQ Q23 and the Playbook matrix, the property remains eligible with Fannie Mae on UAD 3.6 if it meets every other requirement. HBU Playbook ↗
One point needs confirmation. The Playbook’s Scenarios 2, 4 and 8 mark both financially feasible and maximally productive No when another use wins, and this case follows that pattern. Whether Fannie Mae expects a teardown to be marked No on financially feasible, or only on maximally productive, is not stated in the published documents we reviewed.
The as-if-vacant analysis carries more weight than it used to. Fannie Mae’s March 2024 Appraiser Update called the as-if-vacant highest and best use “immaterial.” Appraiser Update ↗ The 2026 FAQ names site value, obsolescence and comparable selection as reasons it can matter, and in Market B it decides the answer.
Reliability
Yes or no zoning questions score near 97% in the best study; numeric standards score lower
The highest and best use section is assembled from zoning, parcel, flood, permit and cost data, much of it public and searchable, which makes it a candidate for AI retrieval.
- Binary zoning questions, with prompting strategiesBartik, Gupta and Milo, NBER, April 2026 ↗96.7%
- Plan review checks matching human reviewers, 1,262 checksSeattle CivCheck evaluation, June 2026 ↗91.7%
- California bulk regulation checks, out of sampleSame NBER study ↗89%
- Binary zoning questions, no prompting strategiesSame NBER study ↗83.5%
- By-law data extraction, range across testsEsri Canada, June 2026 ↗50% to 73.6%
- Numeric questions, with prompting strategiesNBER, April 20260.87
- Numeric questions, no prompting strategiesNBER, April 20260.72
- Minimum lot size, 2024 draftNBER 2024 draft, 0.39 to 0.440.44
In the April 2026 NBER study by Bartik, Gupta and Milo, a language model answered binary zoning questions with 96.7% accuracy and numeric questions with a 0.87 correlation after prompting strategies, against 83.5% and 0.72 without them. NBER ↗ The same team’s 2024 draft found a correlation of only 0.39 to 0.44 on minimum lot size. NBER 2024 ↗ A question such as “is a duplex allowed?” is close to reliable. Setbacks, coverage and lot area per unit are where the errors concentrate, and those inputs drive the physically possible and financially feasible tests. An earlier Urban Institute pilot, before language models, found full automation “impractical and ineffective” and recommended a hybrid. Urban Institute ↗
Seattle’s June 2026 evaluation of CivCheck on middle housing permits is the closest public test of unattended compliance checking. Intake caught 87% of in-scope rejection reasons, and plan review agreed with reviewers on 91.7% of 1,262 checks. In 6.4% of checks the tool passed an item that reviewers required corrected, and the report recommended against using it for compliance checks for now. Seattle CivCheck evaluation ↗
Where Dallas breaks the tools
- 01
Stale code
A dataset’s date can be the date its map polygons were updated, which differs from the ordinance date. Dallas is rewriting Chapter 51A.
- 02
Planned developments
More than 1,000 Dallas PDs, each its own ordinance, with an incomplete online copy.
- 03
State overrides
We found no vendor that documents encoding SB 15, SB 840 or HB 24.
- 04
Private restrictions
Deed restrictions were absent from every zoning dataset reviewed.
- 05
Numeric context
The 2024 NBER draft logged nine misread-context errors, mostly on townhouse and permit-cap questions.
- 06
Citations
Legal research tools hallucinated on 17% to 33% of queries in a 2025 study; legal retrieval systems ranged from under 10% to about 48% in an August 2026 paper, worst on false-premise questions.
- 07
Self-contradiction
An automated Dallas ADU page contradicts itself on legality and setbacks and omits the Board of Adjustment route.
- 08
Unpermitted work
In San Jose, about 78% of detached ADUs built 2016 to 2020 were unpermitted, and garage conversions cannot be seen from above.
Dallas is rewriting Chapter 51A with Camiros; the City’s September 14, 2026 update says the work is moving toward a first public draft, with stated aims of infill design standards and less reliance on planned developments. Dallas Zoning Reform ↗ Every vendor encoding of the current code will need to be redone when the rewrite is adopted. Regrid’s zoning date field records when the polygon was updated, which can differ from the ordinance date. Regrid ↗ The National Zoning Atlas uses human analysts and states that algorithms cannot yet handle the nuance of zoning codes. National Zoning Atlas ↗ We found no vendor that documents parsing individual Dallas PD ordinances, and no published parcel-level test of any commercial zoning dataset against official zoning verification letters.
| Vendor | Returns | Dallas coverage | Accuracy disclosure |
|---|---|---|---|
| Zoneomics | Setbacks, FAR, density, lot, coverage, height, permitted uses; API | Dallas city page | None published; PDs not mentioned |
| Regrid Standardized Zoning | 26 fields including setbacks, units per acre, by-right and conditional uses | Nationwide | Data date is the polygon update date; −5555 means “complex, refer to code” |
| LightBox | Districts, setbacks, density, height, uses | Top 50 metros; city level unconfirmed | Quarterly updates; no guarantee |
| Cotality | Premium tier adds maximum buildable area and units | Top 50 metros, unconfirmed | None |
| Gridics | 3D capacity and buildable area | Listed in 2019 | None |
| Archistar | Site feasibility in 3D | Launched in four DFW counties, December 2022 | None |
| Buildability | Zoning summaries | States it has no validated Dallas source pack | Disclaims appraisal use |
| PropertyZoned | Automated city pages | Dallas ADU page | Contradicts itself |
The deliverable
Twenty-two rows, each with a citation the reviewer can open
An AI-assisted highest and best use section could assemble the retrievals in the case above as a dossier, mapped to the four tests, with each row retrieved by an agent and verified, signed and cited by the appraiser. Any field without a citation is a gap, and the dossier says so.
Legal
- 01Base district and every overlayDallas Map HubDistrict stack with ordinance numbers and version dates
- 02PD ordinance text parsed to standardsChapter 51PStandards table with clause citations
- 03State overrides tested: SB 15, SB 840, HB 24, SB 785Enrolled bill textApplies or does not apply, with the reason
- 04Recorded plat building lines and easementsCounty recordsEnvelope adjustments
- 05Deed restrictions and HOA covenantsCounty records, City listRestriction flags
- 06Permit history and open violationsCity permitsPermitted against unpermitted improvements
- 07Rezoning probabilityNearby cases, votes, protest status, placetypeProbability with the case list
Physical
- 08Lot geometry and buildable envelopeParcel GIS, setbacks, coverageEnvelope area and the binding constraint
- 09Flood zone and map revisionsFEMA NFHLZone, base flood elevation, revisions
- 10Slope and drainageUSGS 3DEPGrade and drainage notes
- 11Tree permit exposureArticle XTriggered or not
- 12Utility capacityDallas Water Utilities letterWill-serve status
- 13Structures from imageryAerial computer visionFootprints against records, ADU flag
Feasible
- 14New-construction pricing by productClosed MLS salesPrice per square foot by unit type
- 15Hard and soft costCost service, bidsCost stack
- 16AbsorptionNew-home dataMonths of supply
- 17Teardown frequencyDemolition permits, appraisal district year-built changesTeardowns per year within a radius
Maximally productive
- 18Residual land by candidate useModelRanked residuals
- 19Risk-adjusted valuesProbability inputs from the legal rowsExpected land value
- 20Sensitivity or simulationModelProbability that redevelopment beats the present use
- 21Contribution of the improvementsResidual against value as improvedContribution and URAR answers
All tests
- 22Provenance logEvery rowSource link, retrieval date, ordinance version, model and prompt version
TestFit, based in Dallas, offers cities a free year of its site-planning software. Bisnow ↗ A.CRE published an open-source agent skill in May 2026 that computes residual land value by use type. A.CRE ↗ CoStar closed its $800 million purchase of Zonda, a source of new-home community and absorption data, in August 2026. RISMedia ↗ The Dallas Central Appraisal District publishes certified data files and GIS parcels; its land and improvement split can screen for teardown candidates, though mass-appraisal values are not market evidence. DCAD ↗
- 01Agent
Assembles the twenty-two rows with a citation for each.
- 02Appraiser
Verifies every legal row against the ordinance text, and orders a zoning verification letter when a PD or overlay is present.
- 03Appraiser
Replaces modeled pricing and cost with market evidence.
- 04Appraiser
Chooses the candidate uses and the probability inputs, and records why.
- 05Appraiser
Answers the URAR fields and writes the commentary.
- 06Reviewer
Confirms that every citation opens and every number reconciles.
USPAP Standards Rule 1-3 requires a highest and best use analysis in market value assignments, and the Interagency Appraisal and Evaluation Guidelines require an opinion of it. Interagency Guidelines ↗ Advisory Opinion 41, adopted April 23, 2026, adds no new requirements and keeps responsibility for the analysis and conclusions with the appraiser. Its framework is to evaluate the tool, evaluate the data, perform the analysis and evaluate the credibility of the output, and it has no provisions specific to zoning or highest and best use. BVWire ↗ The American Society of Appraisers’ January 2026 statement asks members to disclose direct reliance on AI and to proofread its output. ASA ↗
Writing these sections now?
Reporting a highest and best use that differs from the present use?Tell us how you support it, which data you pull, and what reviewers have asked for since September 2.→The subject is a composite with a fictional address. Market values, prices, costs, approval probabilities and delays are modeling assumptions, and closed sales and contractor bids would replace them in an assignment. Regulatory and research figures are as of October 8, 2026; the verbatim text of Selling Guide sections SB4-1.3-04 and SB4-1.3-05 and the URAR field identifiers were not reviewed. This article is general information, not appraisal, legal or compliance advice.
The Signal / Monthly briefing
Follow Fannie Mae and Freddie Mac policy changes, with sources.
One sourced briefing in the first week of each month.
Unsubscribe in one click. We don't sell your email or share it with sponsors. Privacy Policy
Highest and Best Use Commentary Draft
Present use: one-unit detached residence, no ADU, no non-residential use or modifications. The site is zoned R-7.5(A); single-family use is permitted by right. Residual land analysis of a 3,400 sf new single-family residence indicates a land value of $668,000 net of demolition, tree permitting and site costs, which exceeds the $650,000 value of the property as improved. The existing improvements do not contribute value, so the present use is not financially feasible or maximally productive. The highest and best use as improved is redevelopment with a new single-family residence, a residential use. Rezoning to D(A) or MF-1(A) was tested and does not exceed the single-family residual after entitlement cost, delay and approval probability. Comparables are older homes on similar R-7.5(A) lots purchased for redevelopment. Valuation reflects the property as it exists; no redevelopment is required of the owner.